Work Scheduling View in Material Master

In house production time in MRP2 view, specifies the time in workdays needed to produce the material in-house. In-house production time is independent of the order quantity. The system requires the in-house production time to determine the planned dates for planned orders in materials planning.
You can define work scheduling times in the material master record in one of two ways: -Either you enter the in-house production time. If required, you can get the system to update this value from the routing. -Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.